A parking space does not always come with a usable power supply. Check permission, wiring and the electricity bill before you book an EV.

The EV fits in your apartment's parking bay. Getting electricity to that bay may be harder.

If the flat's meter is upstairs and the parking space is in a basement, a charger needs a cable route through shared property. Someone must approve the work, decide who pays and explain what happens when you move out. A dealer's promise of a free charger cannot settle those questions.

Before paying a booking amount for a car, take the parking plan to the building manager and a qualified electrician. Include the flat owner if you rent. You are trying to establish a charging arrangement that works on an ordinary weekday, when the building is busy and you need the car the next morning.

Permission needs to cover the installation

Ask whether the building permits a charger at an individual bay or prefers shared equipment. If individual chargers are allowed, identify who can approve the cable route, wall fixings and work on the distribution board. A verbal yes from a guard is not permission to alter communal wiring.

Get the agreement in writing. It should identify the parking space, the power source, the equipment owner and responsibility for repairs. If your parking allocation can change, decide how the charger moves and who pays. If you rent, record whether you may remove it when the tenancy ends.

Kantipur reported private-charging provisions in NEA's 2078 distribution rules. That historical report does not give every apartment resident permission to change shared property today. Contact your local NEA distribution centre about the connection, the approved load and the requirements that apply. NEA's consumer FAQ explains where to seek connection and tariff information.

Have the supply checked before choosing the wallbox

The electrician needs to inspect the existing supply, protective devices, earthing and proposed cable route. Ask for a written scope of work and commissioning record. Cable size and protection depend on the load, route, length and installation conditions, so each installation needs its own design. Another flat's cable specification does not transfer to yours.

A 7 kW charger adds a substantial load to a building when it runs alongside lifts, pumps and cooking equipment. A wallbox can also be more powerful than the car's onboard charger can use. Ask the dealer for the car's AC limit, then let the electrician assess what the building can safely provide.

A long extension lead from an upper floor is a poor substitute. It crosses shared space, can be damaged and does not establish that the circuit is suitable for hours of charging. Do not treat a socket that powers a vacuum cleaner as proof that it can support a car charger continuously.

For scale, a hypothetical 30 km daily commute at 16 kWh per 100 km uses about 4.8 kWh in the car. If charging efficiency were 90%, replacing it would draw around 5.3 kWh from the meter. A suitable 3.3 kW connection would cover that in about 1.6 hours, so a faster wallbox may not be needed in this household. Actual rate and losses need checking. The arithmetic helps you discuss your needs without buying equipment solely because its rating is larger.

Agree how the bill is measured

A charger connected to the flat's own meter can be simpler to account for, but the physical route may be expensive. A charger on the common meter needs an agreed billing method. Check whether a dedicated meter or submeter suits the building, and agree who will read it.

Use billed energy rather than dashboard kilometres to divide costs. Consumption changes with the journey and load, while the meter records the electricity actually supplied. Write down whether the charge includes only electricity or also equipment maintenance, administration and parking.

A flat monthly charging fee needs a review rule. It may work while one resident charges occasionally and become unfair when several cars use the supply daily. Do not leave the committee to improvise a new rate after the equipment has been installed.

Shared charging has a scheduling problem

A building with several EVs may get more value from scheduled access to one or two chargers than from an unchecked row of individual wallboxes. The electrical design and resident agreement must support that choice.

For illustration, four cars needing 6 kWh each require 24 kWh overnight. At an effective 3 kW, one charger would need around eight charging hours, plus time for cars to swap bays. At 6 kW it would need about four. The calculation covers the electricity only. Whether residents will actually come down at midnight to move a car is a separate question, and it decides whether the schedule holds.

Ask how bookings work, how late arrivals are handled and when a charged car must leave the bay. Decide who can stop a session if equipment is damaged. A shared system needs a named person or a service contract to handle faults. A password passed around in a messaging group will not keep it running.

Visit the nearest public charger as a fallback before buying. Check its connector and opening hours, and count the time a weekly visit would take. If the building arrangement falls through, that fallback becomes part of the real cost of ownership. Settle it while you still have a choice of car.